What's involved

A mezzanine floor can double usable floor space in a tall building. The installer designs a steel structure of columns, main beams and secondary beams, decked with high-density particleboard or steel, sized to the loads you need, typically from around 250 kg to 750 kg per square metre or more. Column base plates spread loads into the slab, which must be checked for strength. Staircases, handrails, kickplates and up-and-over pallet gates are fitted to make the floor safe to use. Mezzanines usually need Building Regulations approval covering structure, fire safety, escape routes and accessibility, and some need fire protection to the steelwork. Planning permission may also apply in some cases. Installation on site typically takes one to three weeks after design and approvals. Provide accurate building dimensions, intended use and loads early, as design and approvals can take several weeks.

How we handle it

  1. Site survey

    The installer measures the building, clear height, columns, doors, sprinklers and lighting, checks the floor, and discusses stock, pallet sizes, weights, picking methods and forklift trucks.

  2. Layout and load design

    You receive a layout drawing, load calculations and a quote. The design shows aisle widths, beam levels, bay sizes and protection, and is checked against your floor and trucks.

  3. Delivery and preparation

    Components are delivered and stored safely. The floor is marked out, the area cleared, and any obstacles or services relocated before installation begins.

  4. Installation

    Frames are assembled, erected, connected with beams and locking pins, plumbed, shimmed and anchored. Decks, protection and accessories are fitted, and load notices displayed.

  5. Inspection and handover

    The installation is checked for plumb, anchoring, locking pins and load notices before handover. You receive the layout and load information, and advice on inspection and safe use.

Price guide

Industrial shelving installation is priced by the job, usually based on the number of bays, pallet locations or square metres, plus the cost of the racking itself. Installation-only prices apply if you already have the equipment. Mezzanines and specialist systems are priced after design. These are typical UK guide prices for 2026.

  • Racking dismantling and re-erection: £8–£20 per pallet location. Taking down, labelling and re-erecting existing racking on the same site.
  • Racking repair (upright replacement): £150–£400 per upright. Offloading, replacing the damaged upright and reinstatement; parts included.
  • Mezzanine floor supplied and installed: £180–£350 per m². Structure, decking, stairs and handrails; fire protection and approvals extra.

Questions about mezzanine floors

Do mezzanine floors need planning permission?

Mezzanines within an existing building often do not need planning permission, but they usually require Building Regulations approval for structure, fire safety and escape. Some cases, such as retail space increases, can need planning permission, so check with your local authority.